Entries from March 2008
Gallery Opening Today!
March 31st, 2008 · 1 Comment
Tags: Uncategorized
last minute details
March 31st, 2008 · No Comments
Can you think of anything you’d rather be doing at 4 in the morning than sticking vinyl letters to the wall, one by one?
Neither could we. At least the lettering is for our names…
Other than that, the podiums need some labels, a board or two need reprinting and voila, instant exhibition.
Tags: Fabrication · Installation
digital fab
March 29th, 2008 · No Comments
Tags: Fabrication · Podium Concept
shadow installation
March 28th, 2008 · No Comments
we are nearly 2/3 of the way finished with the vinyl installation. we will have some more photos this evening testing the system.
Tags: Fabrication · Installation · Organizational Concept
projection script v2.0
March 27th, 2008 · No Comments
Magee steps out of the computer and McFly steps into the spotlight.
Tags: Fabrication · Installation · Scripts
gallery prep shots
March 26th, 2008 · No Comments
Sorry these shots are so crappy, but the lighting in the gallery sucks. Mike, let me know if you need any more.
Tags: Installation
fab photos
March 26th, 2008 · 1 Comment
heres a few miscellaneous photos from the fabrication process that i never got around to uploading.
and this is what we were doing a little over a week ago……..
Tags: Fabrication
oh snap
March 26th, 2008 · 1 Comment
the first shadow went on the wall…errr, column. lookin good.
troy and sean have also masked out the tops for the rp-ed models. also, lookin good.
Tags: Fabrication · Graphics · Installation
single panel, label only? (from taz)
March 26th, 2008 · No Comments
Tags: Fabrication · Graphics · Installation
this is not it.
March 26th, 2008 · 1 Comment
the singular, dominating, unbroken band of white detracts from the dynamism, the twisting, the sensuality of the podiums.
Tags: Fabrication · Graphics · Installation